Saturday, 15 Nov 2025
  • About Us
  • Contact Us
  • Terms and Conditions
  • Privacy Policy
Subscribe
Life Care News
  • Home
  • Business
    • Business Wire
    • Globenews Wire
  • News
    NewsShow More
    Shanghai Electric and Siemens Sign Framework Agreement to Accelerate Green and Digital Power Grid Transformation
    Shanghai Electric and Siemens Sign Framework Agreement to Accelerate Green and Digital Power Grid Transformation
    15/11/2025
    Bybit x Block Scholes Report: Crypto Positioning Forewarned Bitcoin Bear Market
    Bybit x Block Scholes Report: Crypto Positioning Forewarned Bitcoin Bear Market
    15/11/2025
    Intellipaat Partners with IndiaAI Mission (MeitY) to Empower Citizens with AI Literacy and Build an AI-Ready India
    Intellipaat Partners with IndiaAI Mission (MeitY) to Empower Citizens with AI Literacy and Build an AI-Ready India
    14/11/2025
    Riyadh Prepares to Welcome the World: UNIDO 2025 to Shape the Future of Inclusive, Sustainable Industry
    Riyadh Prepares to Welcome the World: UNIDO 2025 to Shape the Future of Inclusive, Sustainable Industry
    14/11/2025
    Varvee Global Limited (VGL) Posts Strong Operational Profit & EBDITA for Q2FY26: +80% Revenue Growth, 49.8% EBITDA Margin; PAT +23.5% YoY; H1 PAT +15.7% and Attaining Near-Zero Debt
    Varvee Global Limited (VGL) Posts Strong Operational Profit & EBDITA for Q2FY26: +80% Revenue Growth, 49.8% EBITDA Margin; PAT +23.5% YoY; H1 PAT +15.7% and Attaining Near-Zero Debt
    13/11/2025
  • Tech
  • Health
  • Sports
  • Entertainment
  • Automobile
  • 🔥
  • news
  • global
  • Business
  •  and
  • announced
  • today
  •  the
  • company
  • june
  • Tech
Font ResizerAa
Life Care NewsLife Care News
  • Home
  • Business
  • News
  • Tech
  • Health
  • Sports
  • Entertainment
  • Automobile
Search
  • Home
  • Business
    • Business Wire
    • Globenews Wire
  • News
  • Tech
  • Health
  • Sports
  • Entertainment
  • Automobile
Follow US
© 2022 Foxiz News Network. Ruby Design Company. All Rights Reserved.
News

Shanghai Electric Signs Parau Phase II 342 MW PV Project with Econergy, Supporting Romania’s Green Future

PRNW Agency
Last updated: 25/10/2025 8:32 PM
PRNW Agency
Share
4 Min Read
Shanghai Electric Signs Parau Phase II 342 MW PV Project with Econergy, Supporting Romania’s Green Future
SHARE
Shanghai Electric Signs Parau Phase II 342 MW PV Project with Econergy, Supporting Romania’s Green Future

As Shanghai Electric’s fourth photovoltaic project in Romania, this initiative marks a major step forward for the country’s clean energy sector.

- Advertisement -

SHANGHAI, Oct. 24, 2025 /PRNewswire/ — Shanghai Electric (SEHK: 2727, SSE: 601727) celebrated a major milestone on October 1 with the signing of the second phase of the 342 MW photovoltaic (PV) general contracting project (the “Project”) in Parau, Romania, with Econergy Renewable Energy Ltd. (“Econergy”). Once completed, the project is expected to supply clean electricity to both residential and commercial users, underscoring Shanghai Electric’s steadfast commitment to advancing green energy development across Central and Eastern Europe.

- Advertisement -

“Shanghai Electric will continue to harness its technological strengths in wind power, photovoltaics, and energy storage to drive the region’s green transition,” said Mr. Wu Lei, Secretary of the Party Committee and Chairman of Shanghai Electric Group. “Building on our successfully completed projects in Romania, we aim to further strengthen our presence across Central and Eastern Europe and deliver tailored solutions that accelerate Romania’s energy transformation.”

- Advertisement -

The Project also represents a key component of Econergy’s strategic expansion across Romania and the wider Central and Eastern European region. According to Andrea Loi, Vice President of Operations at Econergy, “Our decision to partner with Shanghai Electric reflects our full confidence in its technical expertise, project execution capabilities, and extensive international experience. We look forward to close cooperation between our teams to ensure the smooth progress and successful commissioning of this landmark project.”

- Advertisement -

The Parau Phase 2 project is Shanghai Electric’s fourth photovoltaic initiative in Romania, building upon the company’s established track record in the country’s renewable energy sector. This follows the successful commissioning of the Parau Phase I 91.4 MW PV project, which was also executed by Shanghai Electric under an EPC contract. The Phase I project received its Provisional Acceptance Certificate from the client in November 2024 and now supplies green electricity to approximately 70,000 households, reducing carbon dioxide emissions by about 6,800 tons annually. Shanghai Electric’s Romanian portfolio further includes the Schultu 56 MW PV Project, which achieved provisional acceptance in June of this year and has now entered its two-year warranty and operation period, while the Ovidi’s 60 MW PV EPC project, contracted in January, is currently under construction.

- Advertisement -

As of October 2025, Shanghai Electric’s projects in Romania have a combined capacity of approximately 550 MW, providing sustained momentum for the nation’s long-term clean energy development.

- Advertisement -

On the same day as the signing of the Parau Phase II 342 MW PV project, Mr. Wu Lei held separate meetings with Chinese Ambassador to Romania Chen Feng and Istvan-Lorant Antal, Chairman of the Romanian Energy Committee. “Romania is actively advancing its energy structure transformation, primarily in the areas of photovoltaics, energy storage, gas turbines, and power transmission and distribution. We’re looking forward to deepening cooperation with outstanding enterprises like Shanghai Electric to jointly develop renewable energy projects,” said Istvan-Lorant Antal.

- Advertisement -

Mr. Wu Lei also conducted high-level talks with executives from Austria’s OMV Group to explore new cooperation opportunities in the region’s energy sector, further strengthening Shanghai Electric’s pivotal role in Romania’s renewable energy transition.

- Advertisement -

For more information, please visit https://www.shanghai-electric.com/group_en/.

- Advertisement -

Logo – https://mma.prnewswire.com/media/2346204/Shanghai_Electric_logo.jpg 

- Advertisement -

View original content:https://www.prnewswire.co.uk/news-releases/shanghai-electric-signs-parau-phase-ii-342-mw-pv-project-with-econergy-supporting-romanias-green-future-302593827.html

- Advertisement -
TraceLink Ushers in the Agentic Industrial Revolution to Transform Healthcare and Life Sciences Operations for Global Supply Chains
ST Telemedia Global Data Centres (India) Signs Memorandum of Understanding with Maharashtra Government forInvestment of Up to INR 5,000 Crore
Medkart Introduces India's First Room-Temperature Stable Nicorandil Tablets, Enhancing Accessibility to Cardiac Care
Rackspace Technology Reports Inducement Grants Under Nasdaq Listing Rule 5635(c)(4)
I am the captain of my own boat: IOC Young Leader Toms Ser is helping young people in Buenos Aires navigate life through sport
TAGGED: with342acrosscelebratedcentralcleancompletedcountryseasterneconergy,electricelectricsenergyeuropeforwardfourthfuturegreeninitiativemajormarksmilestonenewsoctoctoberparauphasephotovoltaicprojectromaniaromania’ssectorsehkshanghaisignsssestepsupporting
Share This Article
Facebook Copy Link Print
- Advertisement -

Your Trusted Source for Accurate and Timely Updates!

Our commitment to accuracy, impartiality, and delivering breaking news as it happens has earned us the trust of a vast audience. Stay ahead with real-time updates on the latest events, trends.
FacebookLike
XFollow
PinterestPin
InstagramFollow
YoutubeSubscribe
LinkedInFollow
MediumFollow

Most Selling Products

Top Picks, Trending Now – Discover the Best Sellers!
Tecno Camon 20 Premier 5G

Tecno Camon 20 Premier 5G

Dark Welkin | 8GB RAM + 512GB Storage (Expandable RAM up to 16GB) | Industry’s 1st 50MP RGBW-Pro Camera | Segment-First 108MP Ultra-Wide Macro Lens | 6.67" 120Hz 10-bit AMOLED In-Display

iQOO Z10 Lite 5G

iQOO Z10 Lite 5G

Titanium Blue | 6GB RAM + 128GB Storage | Dimensity 6300 5G with 433K+ AnTuTu Score | Robust 6000mAh Battery | IP64 Rated + Military-Grade Shock Resistance

OnePlus 13s

OnePlus 13s

Black Velvet | 12GB RAM + 256GB Storage | Flagship Snapdragon® 8 Elite Chipset | Exceptional Battery Life in a Compact Form | Lifetime Display Warranty Included

Samsung Galaxy A55 5G

Samsung Galaxy A55 5G

Awesome Iceblue | 8GB RAM + 256GB Storage | Premium Metal Frame | 50MP OIS Main Camera with Nightography | IP67 Water & Dust Resistance | Gorilla Glass Victus+ | sAMOLED Display with Vision Booster

You Might Also Like

IBM Introduces Industry-First Software to Unify Agentic Governance and Security
Tech

IBM Introduces Industry-First Software to Unify Agentic Governance and Security

18/06/2025
ITM to Present New Subgroup Analysis Data from the COMPETE Trial at ESMO 2025 and Host an Educational Event for Healthcare Professionals
Health

ITM to Present New Subgroup Analysis Data from the COMPETE Trial at ESMO 2025 and Host an Educational Event for Healthcare Professionals

19/08/2025

Hyundai Motor Group Hosts Pleos SDV Standard Forum to Drive SoftwareDefined Vehicle Era through Collaboration

20/08/2025

Angel Reese and Reebok Reveal Release Date of Her FirstEver Signature Shoe, The Angel Reese 1 Available September 18, 2025

14/08/2025
Life Care News
Facebook Twitter Youtube Rss Medium

Life Care News:


We increase the awareness of millions of users through our news networks. We are one of the most trusted news networks in the world.

Top Categories
  • Home
  • Business
  • News
  • Tech
  • Health
  • Sports
  • Entertainment
  • Automobile
Usefull Links
  • About Us
  • Contact Us
  • Terms and Conditions
  • Privacy Policy
Copyright © 2015 – 2025 LifeCareNews Network. All Rights Reserved. LIFE CARE IS REGISTERED MAGAZINE IN RNI, NO.GUJGUJ/2015/71283
Life Care NewsLife Care News
Copyright © 2015 - 2025 LifeCareNews Network. All Rights Reserved. LIFE CARE IS REGISTERED MAGAZINE IN RNI, NO.GUJGUJ/2015/71283
Welcome Back!

Sign in to your account

Username or Email Address
Password

Lost your password?